Tuesday, 6 December 2011

PRODUCTION DAY 4 : The editing begins

All of the footage was uploaded and arranged into the correct order using final cut, Rob used some great filters on the footage of the CCTV shot.

PRODUCTION DAY 3 : Final filming

The day was very productive for us, we had finished the filming, and began our post production. 
This was quite exiting, to see the footage we recovered had actually matched up perfectly.

Throughout this scene, I had to fall over, and land on my back in the safest way possible. According to our initial story board, the camera would have to do a low from high, 360 degree rotation, but there was no way of doing this, so we decided to go with our back up idea, where the camera would have to follow me, become a tracking shot as I fell to the ground

PRODUCTION DAY 2 : Filming + Editing



Today we filmed shots 11-14. 
Rob was editing the scenes we shot the previous day we spent filming, this gave us more time on our hands.
we spent that time on coming up with some fresh ideas because some things couldn't work, like shot 14, an over the shoulder shot, of my character standing, watching himself run away.